AI compute contracts tracker: who rents compute from whom, for how much and how long

FOURWEEKMBA TRACKER ยท FROM THE NEWSROOM ยท UPDATED 2 NOVEMBER 2026

Anthropic's 3 cloud deals lock in $269.4B to 2036; Reflection can quit SpaceX on 90 days' notice
Free to share with a link to this page. Terms from Anthropic’s and SpaceX’s S-1 filings, CoreWeave’s 8-K and reports by CNBC and Bloomberg; the sum and median are our arithmetic.

The short version: AI labs now rent most of their compute on long contracts they cannot easily cancel. Anthropic’s S-1 shows commitments of $114.5B to Google, $110B to Amazon and $44.9B to Microsoft, $269.4B together, running to 2033-2036 and payable “regardless of actual usage”. At the other end, Reflection AI rents Nvidia GB300 chips from SpaceX for $150 million a month and can walk away on 90 days’ notice after the first three months (CNBC). This page tracks 29 contracts, leases and guarantees between AI buyers and the companies that supply their compute, with the amount, term, size, monthly price and exit terms where they are disclosed.

Only 15 of the 29 rows have a disclosed amount; the rest show “โ€”” with the reason. Amounts are what the filing or report states: minimum commitments, caps (“up to”) and reported figures are labelled as such and never filled in. Data as of 2 Nov 2026.

How AI compute contracts work

  • Renting, not buying. A lab that needs GPUs or TPUs signs with a hyperscaler (Google, Amazon, Microsoft, Oracle), a neocloud (CoreWeave, Nscale, Lambda, Nebius and other GPU-only clouds) or, now, another AI company with spare capacity (SpaceX’s Colossus). It pays per month or against a total commitment.
  • Commitments are take-or-pay. Anthropic must spend at least $110B at Amazon between May 2026 and April 2036 and pay the difference as a “true-up” if it falls short. Take-or-pay explained.
  • Fees often start only on delivery. Under Anthropic’s Nscale and Lambda agreements, fees accrue only as capacity is delivered and accepted, so a late data centre delays the bill, not the obligation.
  • Exits are narrow, or very short. Most big commitments are non-cancellable except for the provider’s uncured breach. The rentals from SpaceX are the exception: either side can leave on 90 days’ notice once the first months pass.
  • Someone else often carries the risk. Backstops and guarantees let lenders fund the buildings: Nvidia agreed to buy any CoreWeave capacity left unsold through April 2032; Nvidia, Google and Broadcom guarantee leases or loans behind data centres their customers will use. How the off-balance-sheet structures work.
  • Much of it sits off the balance sheet. Leases signed but not yet started are disclosed only in the notes: $1,303.8B at Microsoft, Meta, Oracle, Amazon and Alphabet on their latest 10-Qs (our arithmetic, table below).

Every contract, its price and its terms

29 rows (on a phone, swipe the table sideways). Read each row as “buyer rents from provider”. Numbers in brackets link to the sources for that row: filings first, then reports. “Reported” amounts come from the named outlet and are not confirmed in a filing. Chip purchase orders, power contracts and grants are not included.

Who rents from whomDateAmountTermMW / chipsPrice per monthExit terms, guaranteesSources
OpenAI
rents from Microsoft (Azure)
Hyperscalers Cloud commitment ยท Signed
Incremental Azure services OpenAI contracted to purchase under the 28 Oct 2025 agreement (Microsoft 10-Q, subsequent-event note).
28 Oct 2025$250Bโ€”โ€”โ€”โ€”[1]
Anthropic
rents from Broadcom (Google TPUs, Project North Star)
Chipmakers (leases) Equipment lease ยท Signed (reported)
The WSJ reported the obligation; the $60 billion North Star financing funds the chips (Il Sole 24 Ore).
20 Oct 2026more than $160B
reported
Five-year master equipment leases (S-1)About 1.5 GW of Google-designed chips; Google TPUsโ€”Broadcom guarantees more than $42B of senior loans in Project North Star; $18B of junior debt is backed by Anthropic's lease payments (FT)[1] [2] [3] [4]
Anthropic
rents from Google (Cloud)
Hyperscalers Cloud commitment ยท Signed
Separately, Anthropic estimates $125.0B to $150.0B for more TPU compute from TPU providers including Google, delivered 2028-2031, not in this commitment.
Mar 2026at least about $114.5BApril 2026 to July 2033, regardless of actual usageGoogle TPUsโ€”Non-cancellable except for Google's uncured material breach; a true-up is owed if spend falls short[1] [2] [3]
Anthropic
rents from Amazon (AWS)
Hyperscalers Cloud commitment ยท Signed
Apr 2026at least $110.0BMay 2026 to April 2036, regardless of actual usageโ€”โ€”Non-cancellable except for Amazon's uncured material breach; a true-up is owed if spend falls short

Amazon also extends Anthropic a financing facility of up to $20.0B, drawable on AWS compute-delivery milestones (Amazon 10-Q)
[1] [2]
Anthropic
rents from Fluidstack
Neoclouds Data-centre build partnership ยท Announced
Anthropic's $50 billion investment in US computing infrastructure, building data centres with Fluidstack in Texas and New York. A programme value, not a contract value: left out of the charts.
12 Nov 2025$50B investment programmeโ€”โ€”โ€”โ€”[1]
Anthropic
rents from SpaceX (SpaceXAI, Colossus)
AI labs selling compute GPU capacity rental ยท Signed
Update not yet in our database: Anthropic's own S-1 puts all its SpaceXAI arrangements at up to $120.5B, about $3.1B a month once all capacity is delivered (expected December 2026), cancellable on 90 days' notice after non-cancellable periods ending January and March 2027.
May 2026up to $45B (WSJ)
reported
Through May 2029; capacity ramped in May and June 2026 at a reduced feeMore than 300 MW (Anthropic, 6 May 2026); About 325,000 Nvidia GPUs across Colossus and Colossus II$1.25BEither side can end it on 90 days' notice after the first three months (SpaceX S-1)[1] [2]
Anthropic
rents from Microsoft (Azure)
Hyperscalers Cloud commitment ยท Signed
Signed November 2025, amended February and October 2026 (S-1).
Nov 2025at least $44.9BNovember 2026 to May 2033, regardless of actual usageโ€”โ€”Non-cancellable except for Microsoft's uncured material breach or, per tranche, for undelivered tranches[1]
Anthropic
rents from Nscale
Neoclouds GPU capacity rental ยท Signed
Anthropic is up to about $44.6B of Nscale's $103.4B total contract value (Nscale S-1).
Aug 2026up to about $44.6BInto 2033; fees accrue only as capacity is delivered and acceptedAbout 460 MW at the Monarch campus, West Virginia (CNBC); Nvidia Vera Rubin, online end of 2027 (CNBC)โ€”Anthropic can cancel if Nscale misses delivery or availability requirements; Nscale must use best efforts to secure financing

Nvidia is in talks to give Nscale billions of dollars in credit guarantees for the site's debt (Reuters, Bloomberg, 29 Oct); Anthropic has a right of first refusal on Monarch's third building (Bloomberg)
[1] [2] [3] [4] [5] [6]
Microsoft
rents from Nscale
Neoclouds GPU capacity rental ยท Signed (statements of work)
Statements of work listed in Nscale's IPO filing; date = first reported in our newsroom.
18 Oct 2026up to about $43.8BThrough December 2033โ€”โ€”โ€”[1]
Anthropic
rents from Volta Infrastructure Holdings
Neoclouds GPU capacity rental ยท Reported
Norway site (Semafor).
19 Oct 2026$10B
reported
โ€”โ€”โ€”The interest rate on Volta's debt falls if Anthropic gets an investment-grade credit rating (Semafor)[1] [2]
A leading AI lab (not named)
rents from A Penguin Solutions neocloud customer in Norway (not named)
Neoclouds GPU capacity rental ยท Signed (8-K)
Penguin's 8-K names neither party, so this row is left out of the charts in case it repeats a named deal.
6 Oct 2026$10B in contracted computeโ€”โ€”โ€”โ€”[1]
Reflection AI
rents from SpaceX (Colossus 2)
AI labs selling compute GPU capacity rental ยท Signed (reported)
The deal behind our most-read compute story.
22 Jun 2026about $6.3B if it runs the full term
reported
Monthly, 1 July 2026 through 2029Nvidia GB300 chips at the Colossus 2 data centre$150MCancellable on 90 days' notice after the first 3 months[1] [2]
Nvidia
rents from CoreWeave
Neoclouds Capacity backstop ยท Signed
9 Sep 2025$6.3B initial valueThrough 13 April 2032โ€”โ€”Ends on 30 days' notice of breach, or an insolvency proceeding not dismissed within 90 days

Nvidia buys any CoreWeave capacity its own customers leave unsold
[1]
Reflection AI
rents from Nebius Group
Neoclouds GPU capacity rental ยท Reported
14 Jul 2026more than $1B
reported
Through 2029Nvidia GB300 chipsโ€”โ€”[1] [2]
XPERT Software Solutions
rents from XDT Infrastructure (Quanome)
Neoclouds GPU capacity rental ยท Signed (8-K)
29 Sep 2026about $100.9M60 months from service readinessDedicated, physically isolated Nvidia GPU pool for inferenceFixed monthly fee (amount not stated)The fixed monthly fee is not reduced for usage below committed levels

About $45.0M prepayment tied to server procurement milestones
[1]
OpenAI
rents from Oracle (Abilene, Texas)
Hyperscalers Cloud capacity ยท Capacity accepted
Oracle said OpenAI accepted capacity at Abilene in less than 24 hours (reported).
28 Oct 2026โ€”
OpenAI's contract value with Oracle is not in our database yet.
โ€”โ€”โ€”โ€”[1]
Anthropic
rents from Lambda
Neoclouds GPU capacity rental ยท Signed
Agreements signed in May, June and August 2026 (S-1).
May 2026โ€”
Our database holds only the WSJ's combined figure: up to $86B for Nscale and Lambda together. Anthropic's S-1 gives about $41.3B for Lambda (not yet stored as a contract fact).
Into 2034 (through 2034, WSJ)Nvidia GPUsโ€”Either side can end the August 2026 agreement (about $34.9B) if Lambda does not secure the facility lease in time[1] [2] [3]
Duos Technologies
rents from Axe Compute
Neoclouds GPU capacity lease-back ยท Signed (8-K)
Duos leases back the GPU capacity it sold, under a capacity supply arrangement.
30 Sep 2026โ€”
No lease amount in the 8-Ks.
โ€”2,304-GPU cluster, Columbus, Georgiaโ€”Axe bought the cluster and pays Duos a deferred purchase price of $715,000 a month for 60 months[1] [2]
Microsoft
rents from ChronoScale (Applied Digital)
Neoclouds AI compute deployment ยท Announced
Applied Digital says it owns about 96% of ChronoScale.
Oct 2026โ€”
No value disclosed.
โ€”50 MW; Nvidia GB300 NVL72 systemsโ€”โ€”[1]
Microsoft
rents from Nscale (Loughton, UK)
Neoclouds GPU capacity rental ยท Dropped (Telegraph, Oct 2026)
Microsoft scrapped the UK data-centre deal, the Telegraph reported (via Bloomberg).
16 Sep 2025โ€”
No value disclosed.
โ€”More than 23,000 Nvidia GPUsโ€”โ€”[1]
Perplexity
rents from IREN
Neoclouds GPU capacity rental ยท Signed
Runs the models and agents behind Perplexity Computer (IREN).
30 Oct 2026โ€”
Value, term and MW not disclosed.
Multi-yearNvidia Blackwell Ultra GPUsโ€”โ€”[1] [2]
Thinking Machines Lab
rents from Firmus
Neoclouds GPU capacity rental ยท Signed
Training and deployment of its next models on Firmus AI Factory infrastructure.
21 Oct 2026โ€”
No value disclosed.
Multi-yearNvidia GB300 systemsโ€”โ€”[1]
TensorWave
rents from Fermi America (Carson County, Texas)
Landlords Data-centre lease (build-to-suit) ยท Signed (10-Q)
9 Aug 2026โ€”
Rent not disclosed.
15-year initial term, two five-year renewal options222 MWโ€”AMD credit support agreement for the phase-one lease (Fermi)[1] [2]
Anthropic
rents from EverWind (Point Tupper, Nova Scotia)
Landlords Data-centre lease ยท Signed
EverWind's release named only 'a leading frontier AI developer'; the Globe and Mail named Anthropic.
16 Oct 2026โ€”
Rent not disclosed.
20-year lease95 MW phase 1 (late 2027) + 325 MW phase 2 (2028) = 420 MWโ€”EverWind funds all grid connection and upgrade costs so they are not passed to Nova Scotia ratepayers[1] [2]
Anthropic
rents from Beacon Data Centers (Sturgeon County, Alberta)
Landlords Data-centre lease ยท In talks
Two unnamed sources; Anthropic and Beacon declined to comment (Globe and Mail).
30 Oct 2026โ€”
Talks only; no terms reported.
โ€”โ€”โ€”โ€”[1]
CoreWeave
rents from Merlin Properties (Spain)
Landlords Data-centre lease ยท Signed
2026โ€”
Rent not disclosed.
โ€”โ€”โ€”Merlin says it holds contractual guarantees and can cut off the electricity if CoreWeave does not pay[1]
Anthropic
rents from Four data-centre leases + power contracts, Hubbard, Texas
Landlords Lease guarantee ยท Agreed (sources)
Reuters citing the WSJ.
30 Jul 2026โ€”
'Billions of dollars'; no figure reported.
โ€”โ€”โ€”Google guarantees Anthropic's lease and power-payment commitments if it defaults, limited to the minimum lenders required; Google expected to take about a 20% equity stake in the project[1]
OpenAI (tenant)
rents from SB Energy (Ohio)
Landlords Lease guarantee ยท Signed (10-Q)
Nvidia's 10-Q says 'on behalf of a customer'; The Information named OpenAI as the tenant.
Aug 2026โ€”
The figure is a guarantee cap, not a rent: see the guarantee column.
โ€”About 4.25 GW, Pike County, Ohioโ€”Nvidia guarantees capped at $105B for the land, power and shell build-out; the site must host Nvidia AI infrastructure exclusively, with limited exceptions[1] [2]
AI cloud partners (not named)
rents from Their landlords
Landlords Lease guarantee ยท Signed (10-Q)
29 Oct 2026โ€”
Guarantee cap, not a rent.
โ€”โ€”โ€”Nvidia guarantees $3.5B of AI cloud partners' leases; with SB Energy its maximum gross guarantee exposure is $108.5B[1]

The largest contracts

The 10 largest disclosed AI compute contracts total $829.1B; OpenAI's $250B Azure deal leads

Two kinds of number sit side by side here. Filings give minimums (Anthropic’s “at least” commitments to Google, Amazon and Microsoft) or caps (Nscale’s “up to” figures); reports give headline values (the WSJ’s “more than $160 billion” for Anthropic’s lease of Google chips through Broadcom). Anthropic pays SpaceX $1.25 billion a month under the SpaceX filing, 8.3 times Reflection’s $150 million (our arithmetic).

Who supplies the compute

Neoclouds are 14 of the 22 compute deals here but hold 13% of the stated dollars; hyperscalers 62%

Hyperscalers hold most of the disclosed dollars because their contracts are the longest and the only ones disclosed as hard minimums. Neoclouds sign more of the deals, many with no amount published, and depend on lenders, which is why guarantees from Nvidia and others sit behind several of them. See the cash and debt behind them on neocloud balance sheets.

Leases and backstops in the filings

Company totals from the latest 10-Q of each company, not single contracts. These are the obligations behind the data centres the contracts above run in.

CompanyWhatAmountDetailAs of
MicrosoftLeases signed, not yet started (mostly data centres)$364.6BStart FY2027 to FY203430 Sep 2026 [filing]
MetaLeases signed, not yet started (data centres, energy, colocation, network)about $355.73BStart 2026 to 203630 Sep 2026 [filing]
OracleAdditional lease commitments, substantially all data centres$288BStart Q2 FY2027 to FY2029; 15-19 year terms31 Aug 2026 [filing]
AmazonLeases signed, not yet started$164,922MNo data-centre backstop found in the 10-Q30 Sep 2026 [filing]
AlphabetLeases signed, not yet started (data centres, energy)$130.5BStart 2026 to 2031; terms 1 to 26 years30 Sep 2026 [filing]
AlphabetData-centre backstops (lease payments + energy costs)$75.7B$48.0B executed with third-party data-centre providers, $27.7B to put in place; $10.0B of that with Crux AI, a related party30 Sep 2026 [filing]
MetaResidual value guarantees to Louisiana and Texas data-centre ventures$41,493MUp from $28,091M at 31 Dec 2025; 'not probable', no liability recorded30 Sep 2026 [filing]
AlphabetTPU repurchase guarantees$6.6BPlus $16.2B of guarantees on counterparties' power-equipment purchases (through Jan 2049)30 Sep 2026 [filing]

The risks, and who says so

  • Lock-in. Anthropic is on the hook for around $450 billion of cloud computing agreements over the next seven to ten years, the bulk of them noncancelable, the Wall Street Journal reported. Source
  • Pay even if unused. Anthropic's S-1 commits it to spend at Google, Amazon and Microsoft 'regardless of actual usage', and to pay Google and Amazon the difference as a true-up if spend falls short. Source
  • Short exits. SpaceX's compute contracts can be terminated on about 90 days' notice, Reuters reported; the SpaceX S-1 says either party may end Anthropic's agreements on 90 days' notice after three months. Source
  • Cash up front. Cloud providers moved to require multiyear contracts with upfront costs 'often as high as 30%', sometimes with guarantors, the WSJ reported. Source
  • Not enough backstop to go round. SemiAnalysis estimates Nvidia can support up to about 46 GW of capacity with backstops, against about 240 GW of global additions coming in 2026-2030 (analyst estimate). Source
  • Vendor support has a cap. Jensen Huang wrote that Nvidia 'may provide a residual-value support mechanism for up to 25% of an opportunity, assessed carefully on a project-by-project basis.' Source
  • Guarantees off the books. Meta's 10-Q calls a payment under its $41,493 million of residual value guarantees 'not probable' and records no liability for them. Source
  • Delivery is slipping. Digital Realty's signing-to-commencement lag rose to 17 months for Q3 2026 signings from nine months for Q2 (company filing). Source
  • Local opposition. Anthropic's S-1 lists state, local and municipal data-centre moratoriums, considered or approved, among the risks to securing compute. Source

FAQ

Who rents the most AI compute?

Among disclosed contracts, OpenAI’s $250 billion Azure commitment (Microsoft 10-Q) is the largest single figure, and Anthropic has the most contracts: Google, Amazon, Microsoft, SpaceX, Nscale, Lambda, Broadcom, Volta, Fluidstack, a data-centre lease in Nova Scotia and talks for another in Alberta. The WSJ reported Anthropic is on the hook for around $450 billion of cloud agreements over seven to ten years.

What is a neocloud?

A cloud company that rents out GPUs for AI and little else: CoreWeave, Nscale, Lambda, Nebius, IREN, Firmus and others in the table. They usually borrow to buy the chips, so their contracts often come with guarantees or backstops for the lenders.

Why do labs sign contracts they cannot cancel?

To secure capacity years ahead of delivery. Providers ask for long commitments before they build: the WSJ reported cloud providers moved to multiyear contracts with upfront costs often as high as 30%. In return the lab gets capacity that would otherwise go to a rival.

How does Reflection’s SpaceX deal compare?

It is small and short: $150 million a month from 1 July 2026 through 2029, about $6.3 billion if it runs the full term (CNBC), cancellable on 90 days’ notice after the first three months. Anthropic’s arrangement with SpaceX runs at $1.25 billion a month through May 2029 under SpaceX’s filing, with the same 90-day notice. Read our story on the Reflection deal.

What is a backstop?

A promise by a third party to pay or buy if the main customer does not. Nvidia agreed to buy CoreWeave’s unsold capacity through 2032 (initial value $6.3 billion); Alphabet reports $75.7 billion of data-centre backstop obligations in its latest 10-Q.

How often is this page updated?

Weekly. New contract, lease and guarantee facts logged by our newsroom are checked each week and added after review; quarterly 10-Qs update the filing totals. Every row keeps its sources.

From the newsroom

Related trackers: Big Tech AI capex and cash tracker ยท Neocloud balance sheets ยท How Big Tech finances AI data centres off balance sheet ยท AI compute commitments tracker ยท Anthropic compute costs by quarter.

How this page stays current

Built by FourWeekMBA from our newsroom’s database of sourced facts (each row lists the facts it uses), the filings those facts link to (Anthropic and SpaceX S-1s, CoreWeave and Quanome 8-Ks, 10-Qs) and reports by the outlets named. Sums, shares, medians and ratios are our arithmetic. A missing amount is shown as “โ€”” and never estimated. New facts are reviewed weekly before they join the table.