How Data Center Politics Works, in 41 Local Ballot Votes

Data center politics in the United States runs on three levels: local ballots, statewide races and federal pledges. The local level is the easiest to count. Ballotpedia listed 41 local data center measures on the 3 November 2026 ballot, and by our reading of its descriptions, 21 of them, about half, sought a ban or pause.

Ten of those 21 would bar only data centers above a size or power line, five of them at 25 megawatts, by our count. Only one of the 41, in Perry, Ohio, dealt with tax incentives, and one, in Grove City, Ohio, named a water threshold. In races for office, the three campaign positions SemiAnalysis listed were grid costs, tax breaks and water.

Business Pill · Grid Cost Allocation

A short Business Engineer explainer on how grid costs are allocated between customers. It teaches the general idea only and does not discuss the elections or these ballot measures.

The key insight: By our reading of Ballotpedia’s list, 21 of the 41 local data center measures on the 3 November 2026 ballot sought a ban or pause, and 10 of those would bar only data centers above a size or power line; one of the 41 dealt with tax incentives.

What Local Ballots Asked Voters to Decide

We sorted the 41 measures into three groups from Ballotpedia’s descriptions: 21 that would ban or pause data centers, seven that would add rules or review, and 13 that would allow, back or uphold them. Ballotpedia itself classifies only decided outcomes, so the groups are our reading of its descriptions.

Inside the ban-or-pause group, 10 measures would bar data centers above a line. Ottawa, Kansas, and Conneaut, Defiance, Oregon and Sunbury in Ohio set it at 25 megawatts; North Berwick, Maine, at 25,000 square feet. Two Kansas measures target “high impact” data centers and two Ohio measures “large-scale” ones. Seven more would bar data centers with no size line, and four are temporary moratoriums, three of them in Maine for 180 days or six months.

The seven rules-or-review measures include two that would require a public vote on big projects. Grove City, Ohio, set its line at 50 contiguous acres, 20 megawatts of peak demand or 500,000 gallons of water a day. Perry, Ohio, would require financial guarantees from hyperscale developers seeking special tax incentives. Of the 13 allow-or-back measures, seven are advisory yes-questions and five are referendums on decisions already taken, four of them rezonings in Wilmington, Ohio.

The 41 local data center measures on the 3 November 2026 ballot, grouped by what they asked voters to do. Grou
The 41 local data center measures on the 3 November 2026 ballot, grouped by what they asked voters to do. Groups and sub-groups are our arithmetic on Ballotpedia’s one-line descriptions; vote results are not shown.

Who Put the Measures on the Ballot

By our count of Ballotpedia’s Type labels, set out in Citizens Started 25 of 41 Data Center Ballot Measures, 25 of the 41 were citizen initiatives, 11 were referred to voters by local officials and five were referendums. Of the 21 ban-or-pause measures, 14 were initiatives. Ohio held 21 of the 41, as our pre-vote list showed.

The Ohio Capital Journal counted temporary pauses already in place before the vote: “At least 138 Ohio municipalities and townships have active moratoriums on data centers as of Sept. 17”, as quoted in our Ohio piece.

What Candidates Argued About

As we read it, the candidates’ argument was over terms as much as permission. SemiAnalysis, in its 1 November analysis covered in Midterm Pause Pledges Cover 30 GW of 2028 Data Centers, listed three positions candidates campaigned on: “Make datacenters pay their own grid costs (15 candidates)”, “End the tax breaks (12 candidates)” and “Limit or report water use (11 candidates)”.

It also wrote that “nine of the 20 nominees want a pause on new construction and the other 11 want conditions, and the split is about even by party”. It put roughly 30 GW of planned 2028 capacity in states where pause candidates were running, about half of the 62.2 GW of US net additions it models for 2028, by our arithmetic, against 5.7 GW if the candidates backing conditions won.

Texas shows the scale behind the argument. Gov. Greg Abbott’s 3 August letter to the PUC and ERCOT said ERCOT was considering about 474 gigawatts of requests to connect to the grid, and that “Approximately 90 percent of the new power requests are data centers”. Gina Hinojosa’s campaign release listed priorities including “ensuring data center companies prove households won’t pay more for electricity or water”, as quoted in AP Calls 4 of 5 Data Center Governor Races; Cost Terms Vary.

Abbott’s own September directive said data centers “must not use water needed by local communities”, and his office said he will work with the Legislature to eliminate any financial incentives for data centers.

The Federal Layer

In March, Amazon, Google, Meta, Microsoft, OpenAI, Oracle and xAI signed the White House’s Ratepayer Protection Pledge. Its fact sheet says they agreed to cover the cost of grid upgrades for their data centers, “ensuring such expenses are not passed to American households”. A governors’ version, published in July, carries 23 signatures.

In Michigan’s Senate race, covered in AI-Pause Backer El-Sayed Wins Michigan; Musk PAC Spent $9.2M AP called the race for Abdul El-Sayed. His AI plan says that under a frontier-AI pause “new AI data centers wait too”, while Mike Rogers backed a one-year ban on data center construction in August, The National News Desk reported. As we read their records, a pause on data centers was not one side’s position in that race.

How the Votes Went

Local measures are counted by local election offices, not called by AP, and none of the counts we used are certified. After replacing five Ohio rows with local reports citing county boards, all 35 measures with returns on Ballotpedia’s table leaned toward limits, by our arithmetic in our national count; we did not re-check the other 30 rows against county boards.

In Ohio, Fortune reported that at least 14 of 18 municipalities voting on data centers passed bans or other restrictions; by our count of the Cincinnati Enquirer’s lists, limits passed on 17 of 21 measures. Earlier in 2026, in the six such measures voters had already decided, Ballotpedia says the side favoring limits won each time.

Why Voters Care

The Annenberg Public Policy Center found 61% of US adults opposed new data centers in their area in its June-July 2026 survey, up from 49% in February and March, with majorities of Democrats (69%), Republicans (54%) and independents (53%) opposed, as we reported.

Campaigns and outside groups spent $173 million on almost entirely negative ads about data centers during the general election, according to AdImpact data reported by Axios, which we covered here.

Connecting the Coverage

This analysis draws on our election coverage. The chain is AP Calls 4 of 5 Data Center Governor Races; Cost Terms Vary, Data Center Limits Ahead in All 35 Votes on Unofficial Counts, AI-Pause Backer El-Sayed Wins Michigan; Musk PAC Spent $9.2M and Midterms: Ohio Voters Pass Data Center Limits in 14 Towns.

Before the vote we covered Pimco Calls Ohio Ground Zero; 11 of 21 Data Center Ban Votes and Voters in 10 States Face 41 Data Center Measures on Tuesday. The market side is in Samsung, SK Hynix Regain $94B From Midterm Results-Day Lows.

The Structural Read

As we read the 41 descriptions, local ballots mostly asked voters whether, where and how big: 12 of the 41 name a size, power, water or cost line, by our count.

As we read SemiAnalysis’s list next to the ballots, the terms candidates campaigned on, grid costs, tax breaks and water, appear in two of the 41 local measures, Perry and Grove City in Ohio.

As we read the Michigan nominees’ records, a pause on data centers was not one side’s position in that race: Rogers backed a one-year ban, and El-Sayed’s plan says new AI data centers wait during a frontier pause.

Gov. Greg Abbott, letter to the PUC and ERCOT, 3 August 2026

“Approximately 90 percent of the new power requests are data centers”

Three Implications

FOR DATA CENTER DEVELOPERS Ten of the 21 ban-or-pause measures would bar only projects above a size or power line, five of them at 25 megawatts, by our count of Ballotpedia’s descriptions.

FOR THE PLEDGE SIGNERS The White House fact sheet says the seven companies agreed to cover grid-upgrade costs for their data centers; SemiAnalysis counted 15 candidates campaigning on data centers paying their own grid costs.

FOR READERS TRACKING RESULTS All vote figures are unofficial; after our correction, all 35 measures with returns leaned toward limits, by our arithmetic, with 30 rows not re-checked against county boards.

The Business Engineer Lens

This story maps onto the Business Engineer framework The State of AI Data Centers.

The framework puts it this way: “The structural bottleneck isn’t computing, it’s electrons.”

As we read it, local ballots and candidates’ terms decide where the buildings go and who carries the cost of those electrons. The framework predates this election and does not discuss any ballot measure, candidate or state.

Related coverage: AI Super PACs Have Spent $81M on the Midterms, Filings Show · Musk Gave America PAC $216M This Cycle, 1.8x His 2024 Pace · Musk Eyes Space Data Centers; Launch Costs 4.9x Top US Power

What Is Not Established

The groups and sub-groups are our reading of Ballotpedia’s one-line descriptions, not of the full ballot texts. Advisory measures do not bind officials, and campaign positions are not policy. SemiAnalysis’s capacity figures are its model estimates, which we have not verified.

All vote figures are unofficial and none are certified. This analysis does not measure how many projects any measure affects, and we make no forecast on any project, state or company.

This Week In The AI Supercycle

Anthropic’s Reality Check, The Capital Squeeze, & The New World Order

This week’s issue: for two years the AI build-out was priced as a growth story. This week it started being priced as a credit story.

Read the full issue →

Business Engineer Framework

The State of AI Data Centers

A Business Engineer framework on why power, not chips, sets the pace of the AI data center build-out.

Read the Map of AI →

The Bottom Line

By our reading of Ballotpedia’s list, 21 of the 41 local data center measures on the 3 November 2026 ballot sought a ban or pause, and 10 of those would bar only data centers above a size or power line. One of the 41 dealt with tax incentives. Among candidates for office, SemiAnalysis counted 15 campaigning on grid costs, 12 on tax breaks and 11 on water.

95,000+ executives read Business Engineer for the AI strategy frameworks cited by ChatGPT, Claude, and Perplexity.

A note on sourcing. This analysis is built from our own earlier pieces and their datasets; third-party figures are cited as those pieces reported them. Groups are our reading of Ballotpedia’s descriptions. Vote counts are unofficial and not certified. Shares and totals are our arithmetic.

Sources: Ballotpedia, Data center-related ballot measures, 2026 (read 2 Nov 2026) · SemiAnalysis, The Datacenter Backlash Goes Bipartisan, 1 Nov 2026 · White House fact sheet, Ratepayer Protection Pledge, 4 Mar 2026 · Hinojosa campaign release, 23 Jul 2026 · Abdul for Senate, AI Under Control plan, 13 Oct 2026 · Ohio Capital Journal, 18 Sep 2026 · Annenberg Public Policy Center survey, 2026

Scroll to Top
FourWeekMBA