Musk Is Said to Soften on Terafab and Reopen Talks With TSMC

Taiwan trade publication DigiTimes reported on 2 November that Elon Musk is set to “renegotiate” with TSMC on Terafab, citing talk in the supply chain. The report says Musk had insisted on building and operating the fab himself, with TSMC at most subleasing part of the site’s land, and has recently turned more pragmatic. DigiTimes frames it as word in the supply chain, not a confirmed deal.

That is a turn from Musk’s own words on 7 October, when he wrote on X: “No, we will build and run the fab. Let there be ZERO doubt about that.” The report came less than four weeks later.

Business Pill · Lead Time Explained

An evergreen Business Engineer explainer on lead times. It teaches the general idea only and does not discuss Terafab or TSMC.

The key insight: DigiTimes reported on 2 November, citing the supply chain, that Musk is set to renegotiate with TSMC on Terafab, less than four weeks after he wrote that TSMC could sublease part of the site “but nothing more than that.”

What DigiTimes Reported

The DigiTimes article, filed from Hsinchu, carries the headline that Musk’s attitude has turned pragmatic and that he is reportedly set to renegotiate the Terafab cooperation plan with TSMC. Only the headline and the opening lines sit outside the paywall.

Those lines say Musk’s stance on working with TSMC has reportedly changed. He had originally insisted on building and running the wafer fab himself, only considering letting TSMC sublease part of the site’s land. Supply-chain sources say his attitude has softened.

Dan Nystedt, who flagged the report on X as a rumor, summarised the fresh talks as covering “operational control, joint investment, technology” and bottlenecks including advanced packaging and PCB and substrate integration. That list comes from his summary of the paywalled article; we could not read it in the article itself.

Terafab's reported goal of 1 million wafers a month within 10 years versus the 100,000-wafer initial facility
Terafab’s reported goal of 1 million wafers a month within 10 years versus the 100,000-wafer initial facility expected before 2030. Source: THE ELEC, 20 October 2026; the 10x ratio is our arithmetic.

What Musk Said in October

On 3 October, replying on X to a post that another user later described as being about TSMC exploring a Terafab role, Musk wrote: “Just discussions, but something may come of it.”

Four days later he shut the idea down. Replying to a post that said the likeliest deal had TSMC owning and running the fab, he wrote: “No, we will build and run the fab. Let there be ZERO doubt about that.” He added: “Maybe TSMC subleases part of the Terafab if they want, but nothing more than that.”

The DigiTimes report describes exactly that sublease-only position as the starting point Musk has now moved away from.

The Scale Terafab Is Aiming For

Korean outlet THE ELEC reported on 20 October that Terafab’s goal is a fab able to process 1 million wafers a month within 10 years. Industry observers expect the initial facility, at 100,000 wafers a month, to be completed before 2030.

By our arithmetic, the 10-year goal is 10 times the first facility. THE ELEC also reported that the companies are working with Intel on logic semiconductors and are in discussions with TSMC, and that Terafab was in talks with about 10 Korean suppliers.

Tesla, SpaceX and xAI announced in March that they would jointly pursue the project, according to THE ELEC, but have not disclosed a separate corporate entity or ownership structure. That leaves the question of who would control a TSMC role open in public records.

The Terms Named in the Talks

In Musk’s 7 October framing, TSMC’s only possible role was as a tenant. As we read it, the terms Nystedt lists, operational control and joint investment, would bear on whether TSMC stays a tenant or takes a larger role.

Advanced packaging is the other named item. It is the step that turns finished wafers into usable AI chip modules, and it sits in the list Nystedt gives alongside PCB and substrate integration.

The Structural Read

As we read the report, the shift is about role, not just talks: DigiTimes says Musk had insisted on building and running the fab himself, with TSMC limited to subleasing part of the site’s land.

As we read it, the scale explains why the question matters: THE ELEC reported a goal of 1 million wafers a month within 10 years, 10 times the 100,000-wafer first facility by our arithmetic.

Elon Musk on X, 7 October 2026

“No, we will build and run the fab. Let there be ZERO doubt about that.”

Three Implications

FOR TSMC Nystedt’s summary of the report lists operational control and joint investment among the talk topics, beyond the land sublease Musk described on 7 October.

FOR TERAFAB’S PARTNERS THE ELEC reported that the companies are working with Intel on logic semiconductors and that Terafab was in talks with about 10 Korean suppliers.

FOR MUSK’S COMPANIES THE ELEC reported that Tesla, SpaceX and xAI have not disclosed a separate corporate entity or ownership structure for Terafab.

The Business Engineer Lens

This story maps onto the Business Engineer framework AI’s Geopolitical Chokepoint.

The framework puts it this way: “The digital economy rests on a physical foundation that most people in that economy never see.”

As we read it, Terafab is that foundation in plain view: the reported talks turn on who controls and funds the fab, and on advanced packaging and substrates, according to Nystedt’s summary.

Related coverage: TSMC’s $265B Phoenix campus draws Taiwan property investors · Musk’s 1.2M Blackwells would need about 2.2 GW of power

What Is Not Established

Neither Musk, Tesla, SpaceX nor TSMC has confirmed the talks. DigiTimes attributes the shift to supply-chain sources. The readable part of the article gives no terms, no investment figure and no timetable for the renegotiation.

It is also not established whether any TSMC role would go beyond the land sublease Musk allowed for on 7 October.

This Week In The AI Supercycle

Anthropic’s Reality Check, The Capital Squeeze, & The New World Order

This week’s issue: for two years the AI build-out was priced as a growth story. This week it started being priced as a credit story.

Read the full issue →

Business Engineer Framework

AI’s Geopolitical Chokepoint

A Business Engineer framework on the physical bottlenecks under the AI economy.

Read the Map of AI →

The Bottom Line

On 7 October Musk wrote that TSMC could sublease part of Terafab “but nothing more than that.” DigiTimes now reports, citing the supply chain, that he is set to renegotiate with TSMC. Until either company speaks, it is a report of a softer stance, not a deal.

95,000+ executives read Business Engineer for the AI strategy frameworks cited by ChatGPT, Claude, and Perplexity.

A note on sourcing. The DigiTimes report is paywalled; this piece relies on its headline and readable opening, which cite supply-chain sources. Musk quotes are from his X posts; scale figures are from THE ELEC; the 10x ratio is our arithmetic.

Sources: DigiTimes, 2 Nov 2026 · Elon Musk on X, 7 Oct 2026 · THE ELEC, 20 Oct 2026 · Dan Nystedt on X, 1 Nov 2026

Scroll to Top
FourWeekMBA