Samsung Electronics will make base dies for high-bandwidth memory (HBM) for AMD and Nvidia at its second foundry plant in Taylor, Texas, South Korea’s Maeil Business Newspaper reported on 3 November, citing industry sources. The paper says Samsung has orders for the plant’s entire output and that most of the volume secured so far is for AMD. Samsung declined to comment to Reuters, which relayed the report.
The orders come years before the output. Maeil puts formal construction this month, equipment move-in from February 2029 and mass production in 2030. That is 27 months from groundbreaking to the first tools, by our arithmetic, for a plant whose customers are already named.
Business Pill · Backlog
An evergreen Business Engineer explainer on backlog: work that is signed but not yet delivered. It teaches the general idea only and does not discuss Samsung, AMD or Nvidia.
The key insight: By our arithmetic from the months Maeil reports, Samsung’s second Taylor plant goes 27 months from formal construction in November 2026 to equipment move-in in February 2029, with its entire output already booked for AMD and Nvidia base dies, according to the paper.
What Maeil Reported
According to Maeil, Samsung has taken orders for the whole production volume of Taylor fab 2 as HBM base dies to be supplied to AMD and Nvidia. The plant is to use an advanced 2-nanometre process and cover about 2.7 million square feet, or about 250,000 square metres, roughly 1.5 times the first Taylor plant. Maeil and Reuters tie that first plant to Samsung’s Tesla contract.
Groundwork, including site levelling, has already begun, the paper says. It reads the timing as backed by the AMD and Nvidia orders: Samsung said in July it would start construction within the year, and in foundry work, Maeil writes, securing customer volume is what decides when investment is actually spent.
The volume secured so far is mostly base dies for AMD, and capacity is tight even for that, according to people involved who spoke to the paper. A Samsung official told Maeil that customer-related matters were difficult to confirm.

Why the Base Die Matters
A base die is the logic chip at the bottom of an HBM stack, under the stacked DRAM, that helps data move quickly and reliably between the memory and the GPU, Maeil explains. With HBM4, customers have started asking for specific logic or compute functions inside it, and the paper says more companies are ordering base dies separately for next-generation HBM.
Samsung plans to combine the Texas base dies with DRAM made in Korea and deliver the result to customers as HBM, the paper reports. HBM4, now in mass production, and HBM4E, which Samsung has sampled, use 4nm base dies. Maeil says fab 2, which enters mass production in 2030, is likely to make base dies on a 2nm or more advanced process to meet demand for next-generation HBM.
In a companion analysis, Maeil says the finished HBM is expected to be packaged with accelerators from AMD, Broadcom and others made at TSMC’s US plants. It reports that the industry sees Broadcom, which makes AI chips for Google, OpenAI and Anthropic, as a possible further customer for Taylor base dies.
The Nvidia Variable
Maeil’s own report carries the caveat. It says Nvidia has asked the three memory makers, Samsung included, to have the base dies for NVHBM, its next custom HBM, made by TSMC, reportedly to reduce performance differences between suppliers and the validation burden. Samsung is checking whether its own foundry can also make NVHBM base dies in case TSMC capacity falls short, the paper says.
According to the companion analysis, NVHBM moves the memory controller from the GPU into the base die, with 30% more memory bandwidth, 15% lower HBM power and 25% more GPU area. Maeil says HBM4E, which may be produced from as early as next year, is expected to adopt the approach, and that Amazon also takes part.
Samsung currently supplies HBM4 for Nvidia’s Vera Rubin GPU with a base die made on its own 4nm foundry process, the paper says. If NVHBM spreads, Maeil writes, further orders for Samsung’s foundry could be constrained, and Samsung could lose the edge it held over SK Hynix and Micron, which already use TSMC base dies for HBM4.
Where Samsung’s US Foundry Stands
The report follows our coverage today of Samsung’s foundry winning a US customer’s 2nm cloud AI chip through Taiwan’s Faraday Technology, and our earlier coverage of the $16.5 billion Tesla deal. In October we reported that Nvidia and Tesla were said to fund $2.8 billion of Samsung chip substrates, and that Samsung had told clients of its exit from 8-inch foundry by 2030.
Earlier today we reported that Samsung and SK Hynix shares dropped 3% on AI doubts.
Connecting the Coverage
Our related pieces on Samsung’s foundry and AI memory supply:
- The AI Packaging Bottleneck in Numbers: CoWoS, EMIB, ABF: our data piece on chip packaging capacity.
- Altman Meets Samsung Chiefs as Capex Hits 29 Trillion Won: our piece on Samsung’s spending.
- Samsung Lands US 2nm AI Chip via Faraday’s Largest-Ever Deal: our piece earlier today.
The Structural Read
As we read the report, the order book comes before the building: AMD and Nvidia hold the plant’s output while the site is at the groundwork stage, according to Maeil.
As we read it, the base die is where Samsung’s foundry and memory businesses meet: the paper says the Texas die is paired with DRAM made in Korea and delivered as HBM, so the foundry order travels with the memory sale.
As we read Maeil’s caveat, the Nvidia share is the exposed part: the paper reports Nvidia asking memory makers to have NVHBM base dies made by TSMC, with HBM4E expected from as early as next year, years before the Texas plant runs.
Reuters, 3 November 2026
“Construction is due to start formally this month, with the plant having secured orders for its entire output, and most of the secured volume is for AMD, according to Maeil.”
Three Implications
FOR AMD Maeil says most of the fab 2 volume secured so far is base dies for AMD, and that capacity is tight even for that.
FOR NVIDIA The paper says Nvidia has asked the memory makers to have NVHBM base dies made by TSMC, while Samsung checks whether its own foundry could also make them.
FOR SAMSUNG FOUNDRY The plant adds HBM base dies to the Tesla contract tied to the first Taylor plant, per Maeil and Reuters, with mass production planned for 2030.
The Business Engineer Lens
This story maps onto the Business Engineer framework The AI Memory Chokepoint.
The framework puts it this way: “HBM growth is outpacing accelerator demand, making memory the rate-limiting factor in the AI scaling equation.”
As we read it, the Taylor report moves one part of that memory layer, the base die, onto a foundry line in Texas. The framework does not discuss Samsung’s Taylor plant or this report.
What Is Not Established
Neither AMD, Nvidia nor Samsung has confirmed the orders; the report rests on industry sources. The articles we read give no contract value, wafer volume or split between AMD and Nvidia beyond “대부분” (most) for AMD, and no investment figure for fab 2. They do not say whether the Nvidia volume is for standard HBM or NVHBM.
The 2030 mass-production date and the 2nm process are plans as reported, not delivered output. The 27-month interval is our arithmetic from the reported months and is not a figure Samsung gave. We did not contact Samsung, AMD or Nvidia.
The Bottom Line
Maeil reports that AMD and Nvidia have booked the full output of Samsung’s second Taylor plant for HBM base dies, with most of it for AMD. The plant is to break ground this month and take equipment from February 2029, 27 months later by our arithmetic, while Nvidia is pushing its next base dies toward TSMC, the paper says.
95,000+ executives read Business Engineer for the AI strategy frameworks cited by ChatGPT, Claude, and Perplexity.
A note on sourcing. This piece is based on two Korean-language articles Maeil Business Newspaper published on 3 November 2026, which we paraphrase, and Reuters’ English summary of them. Maeil cites industry sources and people involved; Samsung declined to comment to Reuters. The 27-month interval is our arithmetic. We did not contact Samsung, AMD or Nvidia.
Sources: Maeil Business Newspaper (3 Nov 2026, Korean) · Maeil Business Newspaper analysis (3 Nov 2026, Korean) · Reuters (3 Nov 2026)









